How to connect the wall-mounted boiler to the radiator: full analysis of installation steps and precautions
As winter approaches, the installation of wall-mounted boilers and radiators has become the focus of attention for many families. How to correctly connect the wall-mounted boiler and radiator to ensure efficient heating and safe use? This article will provide you with a detailed installation guide and attach recent hot topic data across the entire network for reference.
1. Recent hot topics and heating-related trends

| hot topics | Search volume (last 10 days) | Related keywords |
|---|---|---|
| Wall-hung boiler energy-saving tips | 285,000 times | Gas saving, temperature regulation |
| Radiator installation costs | 192,000 times | Labor cost, material list |
| Heating safety in winter | 157,000 times | Carbon monoxide and water leakage treatment |
2. Core steps for connecting wall-mounted boiler to radiator
1. Preparation
• Confirm that the models of the wall-hung boiler and radiator match (it is recommended to consult a professional)
• Preparation tools: pipe wrench, raw material tape, expansion screws, level, etc.
• Turn off water and power sources to ensure construction safety
2. Installation process
| steps | Operation content | Things to note |
|---|---|---|
| Step 1 | Fixed wall-hung boiler | 1.5-1.8 meters above the ground, away from flammable materials |
| Step 2 | Connect water supply and return pipes | Use union joints for easy maintenance |
| Step 3 | Install radiator | Keep it level and reserve an exhaust valve for each group |
| Step 4 | System water injection and pressurization | The pressure is maintained at 1-1.5Bar |
3. Solutions to common problems
Q1: Is the radiator half hot and half cold?
• Check if exhaust is needed
• Adjust the flow balancing valve of each radiator group
Q2: Does the wall-hung boiler start frequently?
• Check temperature sensor
• Confirm whether the system water pressure is normal
4. Safety regulations and acceptance standards
| Project | Standard requirements |
|---|---|
| Air tightness | 24 hours pressure drop ≤0.1Bar |
| Smoke exhaust safety | Flue inclination angle ≥3° |
| electrical safety | Ground resistance ≤ 4Ω |
5. Professional advice
1. The system must be flushed before first use.
2. It is recommended to install a thermostat to improve energy efficiency
3. Perform professional maintenance every year before the heating season
Through the above structured guidance, you can not only understand the connection methods of wall-mounted boilers and radiators, but also master relevant hot information. If complex installation is required, it is still recommended to contact a professional with a "Gas Installation Qualification" for operation.
check the details
check the details